Market data

How long do public buyers give you to respond? We counted 1,889 notices

We counted the days between posting and due date on 1,889 public A/E notices from the US and Canada, and found that the typical buyer gives you about a month, that one in five US notices gives you less than two weeks, and that US design work gets a shorter clock than other services.

Melany Macías4 min readShare

Quebec City with the Édifice Marie-Guyart. Photo: Wilfredor, CC0, via Wikimedia Commons

When a public RFP is posted, the clock starts before anyone on your team has read it, and yet almost nobody publishes how long that clock usually is. So we counted it ourselves. Canary reads public bid portals every day, and for the two years to October 2026 we had 1,889 US and Canadian notices that recorded both a posting date and a due date, which let us work out how many days each buyer allowed.

  • 29 daysthe typical window in the US (the middle half is 17 to 39)
  • 34 daysthe typical window in Canada (the middle half is 28 to 43)
  • 33%of US design-services notices give you less than 14 days
  • 1,889public notices counted, posted from November 2024 to October 2026

The typical window is about a month

In the United States the median is 29 days, and the middle half of notices fall between 17 and 39 days. In Canada the median is 34 days and the middle half fall between 28 and 43, so a Canadian buyer will usually give you about five more days than a US one, and the range you can expect is much tighter.

Days from posting to due date, notices posted November 2024 to October 2026
MeasureUnited StatesCanada
Notices counted960929
Median window29 days34 days
Middle half of notices17 to 39 days28 to 43 days
Less than 14 days19%2%
Less than 21 days29%10%
45 days or more17%21%

One in five US notices gives you less than two weeks

In the US, 19% of the notices in our records leave less than 14 days between posting and the due date, and 29% leave less than 21, while in Canada only 2% leave less than 14 and 10% less than 21. At the other end, 17% of US notices and 21% of Canadian ones give you 45 days or more, so the long windows exist too. The point is that if your go/no-go usually takes a week, then on nearly one US notice in five that week is at least half of the time you have.

Design work gets the shortest clock in the US

Median days from posting to due date, by kind of work
Kind of workUnited StatesCanada
Design services21 days (249 notices)34 days (712 notices)
Other services30 days (683 notices)31 days (203 notices)

Where a US notice is classified as design services, the median window is 21 days, against 30 days for other services, which is a gap of nine days, and a third of those US design notices (33%) give you less than 14 days and nearly half (49%) less than 21. In Canada the two are close, at 34 days for design services and 31 for other services. We can’t say why from the notices alone, and the US design sample is small and leans on New York City, so we would treat this as a signal to check against your own buyers and not as a rule.

What this changes for your bid decision

A shorter clock makes it more expensive to decide slowly. If your principals only meet on Friday to decide, a 14-day notice is already down to nine days by the time you say yes, and a proposal that needs resumes, project sheets and references from several people has to come together in that time. Whatever tools you use, it helps to know a buyer’s usual window before you start, because some buyers keep to the same pattern every time.

What we counted, and what we didn’t

  • Notices posted between November 1, 2024 and October 31, 2026 that record both a posting date and a due date, with the due date after the posting date and less than 400 days later.
  • The source matters: 655 of the 960 US notices come from the NYC City Record and 202 from SAM.gov, and 850 of the 929 Canadian notices come from Quebec’s SEAO, so these are not national averages and the US figures lean heavily on New York City.
  • We counted only notices that state a due date, which is roughly four in ten of everything we read, so notices that give a due date may differ from those that don’t.
  • The posting date is the date the source published the notice, and a due date moved by an addendum may or may not be reflected, depending on the source.
  • Medians are of notices, not of firms or of dollars.

Frequently asked questions

How long do public buyers usually give you to respond to an A/E RFP?

In the notices we counted, the median is 29 days in the US and 34 days in Canada, measured from the posting date to the due date, and the middle half of notices fall between 17 and 39 days in the US and between 28 and 43 days in Canada.

How many public RFPs give you less than two weeks?

About one in five US notices in our records (19%) and 2% of Canadian ones, so in this sample the very short window is mostly a US thing.

Do design RFPs get shorter response times?

In the US sample they do, with a median of 21 days for design services against 30 for other services, and a third of the US design notices give less than 14 days, but the sample is small and mostly New York City, so check it against your own buyers. In Canada the two are close.

Where do these numbers come from?

From Canary’s own records of public bid portals, mainly the NYC City Record, SAM.gov and Quebec’s SEAO, for notices posted between November 2024 and October 2026.